Generalities

PDF

Details


  • City: Lowenstein
  • Commissioning: 2014/12
  • 13 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Total nominal power: 26,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Green Gecco
  • Operator: RWE
  • Owner: RWE

       Production forecast

  • From Wednesday, July 27 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 7.7 %
  • Expected production: 47,870 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


  • Latitude: 49° 5' 48.1"
  • Longitude: 9° 22' 45.1"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 06/2016