Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Rembrandt (Netherlands)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • City: De Lier en Vlissingen
  • Commissioning: 2015
  • 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Owner: Yard Energy

       Production forecast

  • From Tuesday, June 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 2.7 %
  • Expected production: 2,960 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: De Lier en Vlissingen
  • Commissioning: 2014
  • 3 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Owner: Yard Energy

       Production forecast

  • From Tuesday, June 28 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 7.2 %
  • Expected production: 10,320 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 51░ 27' 13.2"
  • Longitude: 3░ 34' 15.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52░ 39' 40.8"
  • Longitude: 6░ 44' 27.8"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 03/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising