Wind farms
Kaskasi (Germany)| Kaskasi (Germany) |
|
| Operational (342 MW) |

| Country | Germany |
| County/Zone | Offshore |
| Other name | Hochsee testfeld Helgoland |
| Wind farm type | Offshore wind farm |

![]() | 342 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Siemens-Gamesa SG 8.0-167 DD (x 38) |

![]() | |

| Hub height | ![]() |
| Total nominal power | 342,000 kW (uprated turbines) |
| Coordinates | Latitude 54° 29' 24" - Longitude 7° 42' 0" |
| Depth | -23 m |
| Precise localization | Yes |
| Distance from shore | 48 km |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Amrumbank West (3 km) Nordsee One Offshore (5 km) Nordsee Ost (5 km) Meerwind Ost (10 km) Meerwind Süd (10 km) AquaPrimus (32 km) Butendiek (59 km) Boldixum (61 km) Pellworm (61 km) Föhr (62 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Offshore : 31,787.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 March 2026 |
||