Jardinghausen windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Jardinghausen
- Country: Germany
- Total power: 4 MW
- Estimated annual production: 10 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Diepholz
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developed by: Windstrom
- Operator: Windstrom
- Owner: Windstrom
Part #2:
- Part: Syke
- Commissioning: 2007
- 1 turbine(s) Enercon E70/2000 (power 2000 kW, diameter 70 m)
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developed by: WPD
- Operator: e3 GmbH
Update for this sheet: 05/2013
Complete/correct this sheet: contact page