Houyet windfarm (Belgium)
[Back to previous page]
Generalities
- Wind farm name: Houyet
- Country: Belgium
- County / Zone: Namur
- Total power: 2 MW
- Estimated annual production: 5 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
Part #2:
- City: Mesnil-Eglise
- Commissioning: 2004/05
- 1 turbine(s) Enercon E48/800 (power 800 kW, diameter 48 m)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Developed by: Vents d’Houyets
Part #3:
- Part: Finneveaux
- City: Mesnil-Eglise
- Commissioning: 2006/01
- 1 turbine(s) Enercon E48/800 (power 800 kW, diameter 48 m)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Developed by: Allons en Vent
Update for this sheet: 01/2012