Generalities

PDF

Details



Part #1:

  • Commissioning: 1994/10
  • 3 turbines: Vestas V39/500 (power 500 kW, diameter 39 m)
  • Hub height: 40 m
  • Total nominal power: 1,500 kW
  • Operational
  • Onshore wind farm
  • Developers: Ostwind/BOREAS

       Production forecast

  • From Monday, August 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 11.4 %
  • Expected production: 4,110 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Jöhstadt
  • Commissioning: 1994/10
  • 3 turbines: Nordex N27/250 (power 250 kW, diameter 27 m)
  • Hub height: 40 m
  • Total nominal power: 750 kW
  • Operational
  • Onshore wind farm
  • Developers: Ostwind/BOREAS

       Production forecast

  • From Monday, August 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 15 %
  • Expected production: 2,690 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Jöhstadt
  • Commissioning: 1994/10
  • 3 turbines: Micon M400 (power 400 kW, diameter 36 m)
  • Hub height: 40 m
  • Total nominal power: 1,200 kW
  • Operational
  • Onshore wind farm
  • Developers: Ostwind/BOREAS

       Production forecast

  • From Monday, August 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 15 %
  • Expected production: 4,310 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • City: Jöhstadt
  • Commissioning: 1994/10
  • 1 turbine: Enercon
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm
  • Developer: BOREAS

       Production forecast

  • From Monday, August 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.3 %
  • Expected production: 760 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • City: Jöhstadt
  • Commissioning: 1996
  • 4 turbines: (manufacturer name not available)
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, August 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.5 %
  • Expected production: 3,120 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #6:

  • City: Jöhstadt
  • Commissioning: 2004
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, August 29 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.3 %
  • Expected production: 3,030 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #7:

  • City: Jöhstadt
  • Commissioning: 1994/10
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 450 kW
  • Operational
  • Onshore wind farm
  • Developer: BOREAS

Localisation



Part #1:

  • Latitude: 50° 30' 35.9"
  • Longitude: 13° 4' 48"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 50° 30' 35.9"
  • Longitude: 13° 4' 48"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 50° 30' 35.9"
  • Longitude: 13° 4' 48"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 50° 30' 35.9"
  • Longitude: 13° 4' 48"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 50° 30' 35.9"
  • Longitude: 13° 4' 48"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 50° 30' 35.9"
  • Longitude: 13° 4' 48"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 50° 30' 35.9"
  • Longitude: 13° 4' 48"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 05/2016