Wind farms
Lijsbeth Tijs (Netherlands)| Lijsbeth Tijs (Netherlands) |
|
| Operational (5,95 MW) - Dismantled (5,1 MW) |

| Country | Netherlands |
| County/Zone | Noord-Holland |
| City | Koggenland |
| Wind farm type | Onshore wind farm |

![]() | 5.1 MW commissioned |
![]() | 0.85 MW commissioned |
![]() | 5.1 MW decommissioned |
![]() | 5.1 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Gamesa G58/850 (x 6) |
| Operational | Vestas (x 1) |
| Dismantled | Vestas (x 6) |

![]() | |

| City | Koggenland |
| Commissioning | ![]() |
| Turbines | 6x Vestas |
| Total nominal power | 5,100 kW |
| Status | Dismantled (2017/02) |
| Coordinates | Latitude 52° 37' 38.6" - Longitude 4° 59' 28.6" |
| Precise localization | Yes |
| City | Koggenland |
| Commissioning | ![]() |
| Turbine | 1x Vestas |
| Total nominal power | 850 kW |
| Status | Operational |
| Coordinates | Latitude 52° 37' 38.6" - Longitude 4° 59' 28.6" |
| Precise localization | Yes |
| Part | Berkhout |
| City | Koggenland |
| Commissioning | ![]() |
| Turbines | 6x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Hub height | ![]() |
| Total nominal power | 5,100 kW |
| Status | Operational |
| Coordinates | Latitude 52° 37' 38.6" - Longitude 4° 59' 28.6" |
| Precise localization | Yes |
Databases ![]() Netherlands (19.6 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Oudendijk (2 km) Oostwind-1 (6 km) Oostwind-2 (6 km) Kernweg (7 km) Diodeweg (7 km) Blauw (9 km) Westfrisia (11 km) Terdiek 23 (12 km) Terdiek 16 (13 km) De Horn (13 km) | ||
|
Insights Production capacity Netherlands : 11,792.0 MW (end of 2025) Noord-Holland : 919.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 January 2026 |
||