Wind power and windfarms database
Greensolver

English English Deutsch Español


Eoltech

Online access > Wind farms > La Torada Ampliación (Spain)


[Back to previous page]

Generalities

PDF

Details

  • City: Merindad de Valdivieso
  • 3 turbines: Gamesa G58/850 (power 850 kW, diameter 58 m)
  • Total nominal power: 2,550 kW
  • Operational
  • Onshore wind farm
  • Developer: Acciona Energia

       Production forecast

  • From Saturday, December 03 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.1 %
  • Expected production: 3,710 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation

  • Latitude: 42° 50' 24"
  • Longitude: -3° 36' 0"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 09/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising