El Teruelo windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: El Teruelo
- Country: Spain
- County / Zone: Castilla y León
- Total power: 43 MW
- Estimated annual production: 108 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Melgar de Yuso, Villodré y Astudillo
- 51 turbine(s) Gamesa G58/850 (power 850 kW, diameter 58 m)
- Total nominal power: 43,350 kW
- Operational
- Onshore wind farm
- Operator: Iberdrola Renewables
Update for this sheet: 05/2012
Complete/correct this sheet: contact page