The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Espa˝ol 

Online access > Wind farms > Coppanz (Germany)


[Back to previous page]

Germany wind farms file: buy now

Generalities

PDF

Details


Part #1:

  • City: Coppanz
  • Commissioning: 2002
  • 4 turbines: Repower MD70 (power 1 500 kW, diameter 70 m)
  • Hub height: 85 m
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, March 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 1.3 %
  • Expected production: 1,890 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Coppanz
  • Commissioning: 2009
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, March 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 1.5 %
  • Expected production: 830 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Coppanz
  • Commissioning: 2017/02
  • 1 turbine: Enercon E141/4200 (power 4 200 kW, diameter 141 m)
  • Total nominal power: 4,200 kW
  • Operational
  • Onshore wind farm
  • Developer: Enercon
  • Operator: Enercon
  • Owner: Enercon

Localisation


Part #1:

  • Latitude: 50░ 53' 59.9"
  • Longitude: 11░ 30' 35.9"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 50░ 54' 0.1"
  • Longitude: 11░ 31' 39.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 50░ 54' 0.1"
  • Longitude: 11░ 31' 39.1"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 8 February 2017
Complete/correct this sheet:


Eoltech