Kapelle op den Bos windfarm (Belgium)
[Back to previous page]
Generalities
- Wind farm name: Kapelle op den Bos
- Country: Belgium
- County / Zone: Vlaams Brabant
- Total power: 1 MW
- Estimated annual production: 3 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Kapelle op den Bos
- Commissioning: 2001
- 3 turbine(s) Turbowinds T400-34 (power 400 kW, diameter 34 m)
- Hub height: 55 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Operator: Aspiravi
Update for this sheet: 11/2011