The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Espa˝ol 

Online access > Wind farms > Kruibeke (Belgium)


[Back to previous page]

Belgium wind farms file: buy now

Generalities

PDF

Details


Part #1:

  • Part: Braemland I
  • City: Kruibeke
  • Commissioning: 2005/04
  • 3 turbines: Dewind D8.0 (power 2 000 kW, diameter 80 m)
  • Hub height: 100 m
  • Total nominal power: 6,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Fortech
  • Operator: Fortech
  • Owner: Wase Wind

       Production forecast

  • From Sunday, March 26 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 16.8 %
  • Expected production: 24,130 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Part: Braemland II
  • City: Kruibeke
  • Commissioning: 2009
  • 2 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
  • Hub height: 98 m
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Fortech
  • Owner: Wase Wind

       Production forecast

  • From Sunday, March 26 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 26.1 %
  • Expected production: 25,010 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Part: Braemland I
  • Latitude: 51░ 10' 42.8"
  • Longitude: 4░ 16' 42.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Part: Braemland II
  • Latitude: 51░ 10' 52.5"
  • Longitude: 4░ 16' 35.4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Global map



Satellite view




Update for this sheet: 1 April 2016
Complete/correct this sheet:


Eoltech