Centro windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Centro
- Country: Portugal
- County / Zone: Viseu
- Total power: 40 MW
- Estimated annual production: 100 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- Part: Candal e Coelheira
- Commissioning: 2006
- 20 turbine(s) Enercon E70/E4 (power 2000 kW, diameter 70 m)
- Total nominal power: 40,000 kW
- Operational
- Onshore wind farm
- Developed by: Eolica do Centro
- Operator: EDF-EN
- Owner: EDF-EN
Update for this sheet: 04/2012
Complete/correct this sheet: contact page