Meadas windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Meadas
- Country: Portugal
- County / Zone: Viseu
- Total power: 9 MW
- Estimated annual production: 22 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Lamego
- Commissioning: 2005
- 3 turbine(s) Vestas V90/3000 (power 3000 kW, diameter 90 m)
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Developed by: Generg
- Operator: Generg
- Owner: Generg
Update for this sheet: 12/2011
Complete/correct this sheet: contact page