Waterton windfarm (Canada)
[Back to previous page]
Generalities
- Wind farm name: Waterton
- Country: Canada
- County / Zone: Alberta
- Total power: 4 MW
- Estimated annual production: 9 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1998/11
- 1 turbine(s) Vestas
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: TransAlta
Part #2:
- Commissioning: 1998
- 2 turbine(s) Vestas
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Operator: TransAlta
Part #3:
- Commissioning: 2000
- 1 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
- Operator: TransAlta
Part #4:
- Commissioning: 2001
- 1 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
- Operator: TransAlta
Part #5:
- Commissioning: 2002
- 1 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
- Operator: TransAlta
Update for this sheet: 05/2012
Complete/correct this sheet: contact page