Generalities
- Wind farm name: Le Haut des Ailes
- Country: France
- County / Zone: 54
- Total power: 44 MW
- Estimated annual production: 110 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: Haut de Blamont
- City: Igney, Foulcrey, Repaix
- Commissioning: 2008/03
- 5 turbine(s) Repower MM92 (power 2000 kW, diameter 92 m)
- Hub height: 80 m
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developed by: Erelia
- Operator: Erelia
- Owner: Erelia
Part #2:
- Part: La Tournelle
- City: Igney, Foulcrey, Repaix
- Commissioning: 2005/09
- 5 turbine(s) Repower MM82 (power 2000 kW, diameter 82 m)
- Hub height: 80 m
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developed by: Erelia
- Operator: Erelia
- Owner: Erelia
Part #3:
- Part: Le Haut des Grues
- City: Igney, Foulcrey, Repaix
- Commissioning: 2005/09
- 6 turbine(s) Repower MM82 (power 2000 kW, diameter 82 m)
- Hub height: 80 m
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developed by: Erelia
- Operator: Erelia
Part #4:
- Part: Le Haut des Masures
- City: Igney, Foulcrey, Repaix
- Commissioning: 2005/09
- 6 turbine(s) Repower MM82 (power 2000 kW, diameter 82 m)
- Hub height: 80 m
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developed by: Erelia
- Operator: Erelia
- Owner: Erelia
Update for this sheet: 04/2012