Wennerstorf windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Wennerstorf
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 10 MW
- Estimated annual production: 26 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Wennerstorf
- Commissioning: 2003
- 4 turbine(s) Bonus B62/1300 (power 1300 kW, diameter 62 m)
- Hub height: 68 m
- Total nominal power: 5,200 kW
- Operational
- Onshore wind farm
- Developed by: Plan 8/Abo Wind
- Operator: ABO-Wind
Part #2:
- City: Wennerstorf
- Commissioning: 2003/10
- 4 turbine(s) Bonus B62/1300 (power 1300 kW, diameter 62 m)
- Total nominal power: 5,200 kW
- Operational
- Onshore wind farm
- Developed by: Plan 8
Update for this sheet: 04/2012
Complete/correct this sheet: contact page