Delmenhorst windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Delmenhorst
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 16 MW
- Estimated annual production: 40 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2005
- 1 turbine(s) Vestas V90/2000 (power 2000 kW, diameter 90 m)
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Part #2:
- Commissioning: 2004
- 5 turbine(s) (manufacturer name not available)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2006
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1994/10
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page