Harrienstedt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Harrienstedt
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 9 MW
- Estimated annual production: 22 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2004
- 5 turbine(s) Vestas V82/1500 (power 1500 kW, diameter 82 m)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Part #2:
- Commissioning: 2004
- 1 turbine(s) Repower MD77 (power 1500 kW, diameter 77 m)
- Hub height: 100 m
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Update for this sheet: 12/2010
Complete/correct this sheet: contact page