Elster III windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Elster III
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total power: 14 MW
- Estimated annual production: 34 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Elster
- Commissioning: 2002
- 23 turbine(s) Enercon E40/600 (power 600 kW, diameter 40 m)
- Total nominal power: 13,800 kW
- Operational
- Onshore wind farm
- Developed by: WPD
- Operator: WSB Neue Energien GmbH
Update for this sheet: 03/2013
Complete/correct this sheet: contact page