Quenstedt windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Quenstedt
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total power: 19 MW
- Estimated annual production: 47 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Quenstedt
- Commissioning: 2000/04
- 8 turbine(s) Tacke 1.5s (power 1500 kW, diameter 77 m)
- Hub height: 85 m
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developed by: EAB New Energy Group
- Operator: Enertrag
Part #2:
- City: Quenstedt
- Commissioning: 2000
- 4 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 2,640 kW
- Operational
- Onshore wind farm
Part #3:
- City: Quenstedt
- Commissioning: 2007
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012
Complete/correct this sheet: contact page