Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Utgast (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • Commissioning: 1996
  • 34 turbines: Tacke TW-600 (power 600 kW, diameter 43 m)
  • Hub height: 50 m
  • Total nominal power: 20,400 kW
  • Operational
  • Onshore wind farm
  • Developer: Ostwind

       Production forecast

  • From Wednesday, December 07 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 60.1 %
  • Expected production: 294,380 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

       Production forecast

  • From Wednesday, December 07 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 57.4 %
  • Expected production: 338,760 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Utgast
  • Commissioning: 1994
  • 7 turbines: (manufacturer name not available)
  • Total nominal power: 3,150 kW
  • Operational
  • Onshore wind farm
  • Developer: PNE

       Production forecast

  • From Wednesday, December 07 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 73.4 %
  • Expected production: 55,510 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 53░ 38' 24"
  • Longitude: 7░ 31' 48"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 53░ 38' 24"
  • Longitude: 7░ 31' 48"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 53░ 38' 24"
  • Longitude: 7░ 31' 48"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 11/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising