[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Part #2:
- Part: Part 2
- City: Alatengaobao Sumu
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Part: Part 1
- Latitude: 40° 22' 55.1"
- Longitude: 104° 9' 21.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: 41° 17' 16.7"
- Longitude: 109° 55' 8.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 29 August 2022
Complete/correct this sheet: