Feldheim windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Feldheim
- Country: Germany
- County / Zone: Brandenburg
- Total power: 54 MW
- Estimated annual production: 135 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Feldheim
- Commissioning: 2002
- 7 turbine(s) (manufacturer name not available)
- Total nominal power: 12,600 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #2:
- City: Feldheim
- Commissioning: 2005
- 4 turbine(s) Enercon E70/2000 (power 2000 kW, diameter 70 m)
- Hub height: 100 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #3:
- City: Feldheim
- Commissioning: 1998
- 4 turbine(s) Enercon E66/1500 (power 1500 kW, diameter 66 m)
- Hub height: 85 m
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #4:
- City: Feldheim
- Commissioning: 2005
- 6 turbine(s) Enercon E70/E4 (power 2000 kW, diameter 70 m)
- Hub height: 98 m
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #5:
- City: Feldheim
- Commissioning: 2006
- 10 turbine(s) (manufacturer name not available)
- Total nominal power: 20,000 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #6:
- City: Feldheim
- Commissioning: 1998
- 1 turbine(s) (manufacturer name not available)
- Hub height: 70 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #7:
- City: Feldheim
- Commissioning: 1998
- 1 turbine(s) Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Update for this sheet: 05/2012