[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 425,000 kW
- Operational
- Onshore wind farm
- Operator: China Three Gorges Corporation
Part #2:
- Part: Part 2
- Turbine(s): (manufacturer name not available)
- Total nominal power: 625,000 kW
- Under construction
- Onshore wind farm
- Operator: China Three Gorges Corporation
Part #3:
- Part: Part 3
- Turbine(s): (manufacturer name not available)
- Total nominal power: 650,000 kW
- Under construction
- Onshore wind farm
- Operator: China Three Gorges Corporation
Localisation
Part #1:
- Part: Part 1
- Latitude: 41° 52' 44.3"
- Longitude: 111° 16' 33.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: 41° 52' 44.3"
- Longitude: 111° 16' 33.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Part 3
- Latitude: 41° 52' 44.3"
- Longitude: 111° 16' 33.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 20 October 2023
Complete/correct this sheet: