Carreço e Outeiro windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Carreço e Outeiro
- Country: Portugal
- County / Zone: Viana do Castelo
- Total power: 33 MW
- Estimated annual production: 81 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Outeiro
- Commissioning: 2005
- 1 turbine(s) Nordex N90/2300 (power 2300 kW, diameter 90 m)
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developed by: Enersis
- Operator: Generg
- Owner: Generg
Part #2:
- City: Outeiro
- Commissioning: 2004
- 8 turbine(s) Nordex N90/2300 (power 2300 kW, diameter 90 m)
- Total nominal power: 18,400 kW
- Operational
- Onshore wind farm
- Developed by: Enersis
- Operator: Generg
- Owner: Generg
Part #3:
- City: Outeiro
- Commissioning: 2009
- 6 turbine(s) Enercon E82/2000 (power 2000 kW, diameter 82 m)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developed by: ENEOP
- Operator: ENEOP
- Owner: ENEOP
Update for this sheet: 12/2011