Parc du Lauragais windfarm (France)
[Back to previous page]
Generalities
- Wind farm name: Parc du Lauragais
- Country: France
- County / Zone: 31
- Total power: 18 MW
- Estimated annual production: 45 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: La Lande
- City: Montégut-Lauragais
- Commissioning: 2009/01
- 5 turbine(s) Ecotecnia 80 1.6 (power 1670 kW, diameter 80 m)
- Hub height: 60 m
- Total nominal power: 8,350 kW
- Operational
- Onshore wind farm
- Developed by: Hydro-M
- Operator: Hydro-M
- Owner: 3V Développement
Part #2:
- Part: Le Bois
- City: Roumens
- Commissioning: 2009/01
- 6 turbine(s) Ecotecnia 80 1.6 (power 1670 kW, diameter 80 m)
- Hub height: 60 m
- Total nominal power: 10,020 kW
- Operational
- Onshore wind farm
- Developed by: Hydro-M
- Operator: Hydro-M
- Owner: 3V Développement
Update for this sheet: 04/2012
Complete/correct this sheet: contact page