Paul da Serra windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Paul da Serra
- Country: Portugal
- County / Zone: Madeira
- Total power: 9 MW
- Estimated annual production: 23 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
Part #2:
- Part: Enereem
- Commissioning: 2003
- 5 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
- Developed by: ENEREEM
- Operator: ENEREEM
- Owner: EEM
Update for this sheet: 04/2011
Complete/correct this sheet: contact page