Niutouling windfarm (China)
[Back to previous page]
Generalities
- Wind farm name: Niutouling
- Country: China
- County / Zone: Guangdong
- Total power: 46 MW
- Estimated annual production: 115 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Nan’ao
- Commissioning: 1995/01
- 15 turbine(s) Nordtank
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Nan’ao
- Commissioning: 1998/05
- 40 turbine(s) Neg Micon NM43/600 (power 600 kW, diameter 43 m)
- Total nominal power: 24,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Nan’ao
- Commissioning: 1998/08
- 10 turbine(s) Zond Z-40 (power 500 kW, diameter 40 m)
- Total nominal power: 5,500 kW
- Operational
- Onshore wind farm
Part #4:
- City: Nan’ao
- Commissioning: 2000/08
- 18 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Total nominal power: 13,500 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2011
Complete/correct this sheet: contact page