Sange (No.1) windfarm (China)
[Back to previous page]
Generalities
- Wind farm name: Sange (No.1)
- Country: China
- County / Zone: Sinkiang
- Total power: 40 MW
- Estimated annual production: 100 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
- City: Dabancheng
- Commissioning: 1998/12
- 5 turbine(s) (manufacturer name not available)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developed by: Xinjiang Wind Energy Liability Co..LTD.
Part #6:
- City: Dabancheng
- Commissioning: 1999/10
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
- Developed by: Xinjiang Wind Energy Liability Co..LTD.
Part #7:
Part #8:
Part #9:
Part #10:
Part #11:
Part #12:
Part #13:
Part #14:
Part #15:
Part #16:
Update for this sheet: 04/2012
Complete/correct this sheet: contact page