Chaiwopu (No.2) windfarm (China)
[Back to previous page]
Generalities
- Wind farm name: Chaiwopu (No.2)
- Country: China
- County / Zone: Sinkiang
- Total power: 83 MW
- Estimated annual production: 207 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Dabancheng
- 10 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #2:
- City: Dabancheng
- Commissioning: 1992/11
- 4 turbine(s) Bonus
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #3:
- City: Dabancheng
- Commissioning: 1992/12
- 4 turbine(s) Nordtank NTK300/31 (power 300 kW, diameter 31 m)
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #4:
- City: Dabancheng
- Commissioning: 1993/12
- 4 turbine(s) Bonus
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #5:
- City: Dabancheng
- Commissioning: 1994/12
- 19 turbine(s) Nordtank NTK300/31 (power 300 kW, diameter 31 m)
- Total nominal power: 5,700 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #6:
- City: Dabancheng
- Commissioning: 1995/07
- 2 turbine(s) Nordtank NTK300/31 (power 300 kW, diameter 31 m)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #7:
- City: Dabancheng
- Commissioning: 1997/11
- 12 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #8:
- City: Dabancheng
- Commissioning: 1997/12
- 66 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Total nominal power: 39,600 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #9:
- City: Dabancheng
- Commissioning: 1998/08
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #10:
- City: Dabancheng
- Commissioning: 1999/12
- 4 turbine(s) Nedwind
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Part #11:
- City: Dabancheng
- Commissioning: 2001/12
- 31 turbine(s) Nedwind
- Total nominal power: 15,500 kW
- Operational
- Onshore wind farm
- Developed by: LongYuan
- Operator: LongYuan
Update for this sheet: 12/2011