HjArtholmen windfarm (Sweden)
[Back to previous page]
Generalities
- Wind farm name: HjArtholmen
- Country: Sweden
- County / Zone: VAstra Götaland
- Total power: 2 MW
- Estimated annual production: 4 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: HjArtholmen Abel
- City: gothenburg
- Commissioning: 2002/03
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
- Operator: Göteborg Energi
Part #2:
- Part: HjArtholmen Axel
- City: gothenburg
- Commissioning: 2002/03
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
- Operator: Göteborg Energi
Part #3:
- Part: HjArtholmen Boel
- City: gothenburg
- Commissioning: 2002/03
- 1 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 40 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- Part: HjArtholmen Görel
- City: gothenburg
- Commissioning: 2002/04
- 1 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 40 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #5:
- Part: HjArtholmen Set
- City: gothenburg
- Commissioning: 2002/03
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
- Operator: Göteborg Energi
Update for this sheet: 07/2012
Complete/correct this sheet: contact page