Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol

Online access > Wind farms > Runderweg 03 (Netherlands)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • Part: Runderweg 03-1
  • City: Lelystad
  • Commissioning: 1998
  • 1 turbine: Neg Micon
  • Total nominal power: 600 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, January 20 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 1 %
  • Expected production: 140 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Part: Runderweg 03-2
  • City: Lelystad
  • Commissioning: 2005
  • 1 turbine: Neg Micon
  • Total nominal power: 1,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, January 20 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 1.3 %
  • Expected production: 300 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Part: Runderweg 03-3
  • City: Lelystad
  • Commissioning: 2005
  • 1 turbine: Neg Micon
  • Total nominal power: 1,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, January 20 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 1.3 %
  • Expected production: 300 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Part: Runderweg 03-1
  • Latitude: 52░ 33' 24.2"
  • Longitude: 5░ 33' 38.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Part: Runderweg 03-2
  • Latitude: 52░ 33' 24.2"
  • Longitude: 5░ 33' 38.3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Part: Runderweg 03-3
  • Latitude: 52░ 33' 24.2"
  • Longitude: 5░ 33' 38.3"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:

Eoltech

www.thewindpower.net - 2005-2017 - all rights reserved - contact - partners - advertising