Algermissen windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Algermissen
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 11 MW
- Estimated annual production: 26 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2009/10
- 2 turbine(s) Bonus B76/2000 (power 2000 kW, diameter 76 m)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2002/09
- 2 turbine(s) Bonus B76/2000 (power 2000 kW, diameter 76 m)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1999/12
- 2 turbine(s) Enercon E40/600 (power 600 kW, diameter 40 m)
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2003/10
- 1 turbine(s) GE 1.5sl (power 1500 kW, diameter 77 m)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Update for this sheet: 01/2011
Complete/correct this sheet: contact page