Bliesdorf windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Bliesdorf
- Country: Germany
- County / Zone: Brandenburg
- Total power: 44 MW
- Estimated annual production: 109 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Bliesdorf
- Commissioning: 2001
- 8 turbine(s) Vestas V80/2000 (power 2000 kW, diameter 80 m)
- Total nominal power: 16,000 kW
- Operational
- Onshore wind farm
- Developed by: Ventotec
Part #2:
- City: Bliesdorf
- Commissioning: 2001
- 10 turbine(s) Vestas V66/1650 (power 1650 kW, diameter 66 m)
- Total nominal power: 16,500 kW
- Operational
- Onshore wind farm
- Developed by: Ventotec
Part #3:
- City: Bliesdorf
- Commissioning: 2004
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Part #4:
- City: Bliesdorf
- Commissioning: 2004
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 1,700 kW
- Operational
- Onshore wind farm
Part #5:
- City: Bliesdorf
- Commissioning: 2004
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,750 kW
- Operational
- Onshore wind farm
Part #6:
- City: Bliesdorf
- Commissioning: 2005
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,750 kW
- Operational
- Onshore wind farm
Update for this sheet: 09/2010
Complete/correct this sheet: contact page