Balve windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Balve
- Country: Germany
- County / Zone: Rheinland-Pfalz
- Total power: 7 MW
- Estimated annual production: 17 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2005/11
- 2 turbine(s) Fuhrländer FL 1500/77 (power 1500 kW, diameter 77 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developed by: Juwi
Part #2:
- Commissioning: 2006/12
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2001/12
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1997/12
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2010
- 1 turbine(s) Vestas V90/2000 (power 2000 kW, diameter 90 m)
- Hub height: 105 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developed by: SeeBA EnergyFarming
Update for this sheet: 05/2012
Complete/correct this sheet: contact page