Cesme windfarm (Turkey)
[Back to previous page]
Generalities
- Wind farm name: Cesme
- Country: Turkey
- County / Zone: Izmir
- Total power: 86 MW
- Estimated annual production: 215 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1998
- 3 turbine(s) Enercon E44/600 (power 600 kW, diameter 44 m)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
- Operator: Alize
Part #2:
- Commissioning: 1998
- 12 turbine(s) Vestas
- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
- Operator: Güçbirligi
Part #3:
- Commissioning: 2007
- 49 turbine(s) Enercon
- Total nominal power: 39,200 kW
- Operational
- Onshore wind farm
- Operator: Mare
Part #4:
- Commissioning: 2009
- 9 turbine(s) Nordex
- Total nominal power: 22,500 kW
- Operational
- Onshore wind farm
- Operator: Mazi-3
Part #5:
- Commissioning: 2009
- 6 turbine(s) Nordex
- Total nominal power: 15,000 kW
- Operational
- Onshore wind farm
- Operator: Kores
Update for this sheet: 02/2011
Complete/correct this sheet: contact page