Rotterdam windfarm (Netherlands)
[Back to previous page]
Generalities
- Wind farm name: Rotterdam
- Country: Netherlands
- County / Zone: Zuid-Holland
- Total power: 239 MW
- Estimated annual production: 597 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- 71 turbine(s) (manufacturer name not available)
- Total nominal power: 132,500 kW
- Operational
- Onshore wind farm
Part #2:
- City: Rotterdam
- Commissioning: 2004/11
- 6 turbine(s) Neg Micon NM72/2100 (power 2100 kW, diameter 72 m)
- Hub height: 70 m
- Total nominal power: 12,600 kW
- Operational
- Onshore wind farm
- Operator: WNW
Part #3:
- City: Rotterdam
- Commissioning: 2005/12
- 5 turbine(s) Vestas V80/2000 (power 2000 kW, diameter 80 m)
- Hub height: 78 m
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Operator: Utility Delta/WinWind
Part #4:
- City: Rotterdam
- Commissioning: 2007/05
- 2 turbine(s) Nordex N90/2500 (power 2500 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
- Operator: Raedthuys
Part #5:
- Part: Dobbelsteen
- City: Rotterdam
- Commissioning: 1989/11
- 0 turbine(s) Nedwind 35/500 (power 500 kW, diameter 35 m)
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #6:
- Part: Dobbelsteen
- City: Rotterdam
- Commissioning: 2005/04
- 3 turbine(s) Vestas NM92/2750 (power 2750 kW, diameter 92 m)
- Hub height: 78 m
- Total nominal power: 8,250 kW
- Operational
- Onshore wind farm
- Operator: Eneco
Part #7:
- Part: Hartelkanaal
- City: Rotterdam
- Commissioning: 1993/02
- 0 turbine(s) Nedwind 35/500 (power 500 kW, diameter 35 m)
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #8:
- Part: Hartelkanaal
- City: Rotterdam
- Commissioning: 2004/09
- 9 turbine(s) Nordex N80/2500 (power 2500 kW, diameter 80 m)
- Hub height: 80 m
- Total nominal power: 22,500 kW
- Operational
- Onshore wind farm
Part #9:
- Part: Hartelkanaal
- City: Rotterdam
- Commissioning: 1995/05
- 0 turbine(s) Nedwind 40/500 (power 500 kW, diameter 40 m)
- Hub height: 40 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
- Operator: Investment E.
Part #10:
- Part: Nerefco Refinery - Hartelkanaal
- City: Rotterdam
- Commissioning: 2002/10
- 9 turbine(s) Nordex N80/2500 (power 2500 kW, diameter 80 m)
- Hub height: 80 m
- Total nominal power: 22,500 kW
- Operational
- Onshore wind farm
- Operator: Nerefco Refinery
Part #11:
- Part: Slufterdam - Noord
- City: Rotterdam
- Commissioning: 2002/08
- 8 turbine(s) GE 1.5s (power 1500 kW, diameter 70.5 m)
- Hub height: 67 m
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Operator: Eneco
Part #12:
- Part: Slufterdam - Noord
- City: Rotterdam
- Commissioning: 1991
- 0 turbine(s) Nedwind 35/500 (power 500 kW, diameter 35 m)
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #13:
- Part: Slufterdam-West
- City: Rotterdam
- Commissioning: 2003/09
- 9 turbine(s) GE 1.5s (power 1500 kW, diameter 70.5 m)
- Hub height: 65 m
- Total nominal power: 13,500 kW
- Operational
- Onshore wind farm
- Operator: Nuon Renewables
Update for this sheet: 05/2012
Complete/correct this sheet: contact page