Generalities
- Wind farm name: Bad Gandersheim
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 5 MW
- Estimated annual production: 12 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000/12
- 1 turbine(s) Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height: 78 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #2:
- Commissioning: 2000/12
- 2 turbine(s) Enercon E66/1800 (power 1800 kW, diameter 66 m)
- Hub height: 65 m
- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #3:
- Commissioning: 2002/06
- 1 turbine(s) Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height: 78 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Update for this sheet: 05/2012