Made windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Made
- Country: Denmark
- Total power: 7 MW
- Estimated annual production: 16 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Made
- Commissioning: 1997/02
- 6 turbine(s) Nordtank
- Hub height: 45 m
- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
Part #2:
- City: Made
- Commissioning: 1990/03
- 3 turbine(s) Vestas V25/200 (power 200 kW, diameter 25 m)
- Hub height: 29 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- City: Made
- Commissioning: 1991/07
- 1 turbine(s) Wincon
- Hub height: 29 m
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Part #4:
- City: Made
- Commissioning: 1991/07
- 4 turbine(s) Vestas V25/200 (power 200 kW, diameter 25 m)
- Hub height: 29 m
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
Part #5:
- City: Made
- Commissioning: 2001/11
- 1 turbine(s) Neg Micon
- Hub height: 45 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #6:
- City: Made
- Commissioning: 2001/12
- 1 turbine(s) Neg Micon
- Hub height: 45 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Update for this sheet: 10/2010
Complete/correct this sheet: contact page