Arup windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Arup
- Country: Denmark
- Total power: 1 MW
- Estimated annual production: 3 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1995/01
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
- Owner: Falck Renewables
Part #2:
- Commissioning: 1990/04
- 1 turbine(s) (manufacturer name not available)
- Hub height: 30 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Update for this sheet: 01/2011
Complete/correct this sheet: contact page