Vollerup windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Vollerup
- Country: Denmark
- Total power: 1 MW
- Estimated annual production: 2 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1993/12
- 1 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 40 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1988/01
- 0 turbine(s) Wind World W2320/160 (power 160 kW, diameter 23.2 m)
- Hub height: 20 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #3:
- Commissioning: 1989/02
- 1 turbine(s) Wind World W2320/150 (power 150 kW, diameter 23.2 m)
- Hub height: 30 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1990/01
- 1 turbine(s) Wincon
- Hub height: 28 m
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page