Nordwalde windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Nordwalde
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 11 MW
- Estimated annual production: 27 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002/11
- 2 turbine(s) Neg Micon NM60/1000 (power 1000 kW, diameter 60 m)
- Hub height: 80 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developed by: WKN AG
- Operator: WKN AG
Part #2:
- Commissioning: 1995/11
- 1 turbine(s) Tacke
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1998/09
- 1 turbine(s) Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2002/03
- 1 turbine(s) Enercon E40/600 (power 600 kW, diameter 40 m)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2001/07
- 5 turbine(s) Tacke 1.5i (power 1500 kW, diameter 65 m)
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012