Zerbst windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Zerbst
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total power: 17 MW
- Estimated annual production: 41 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2005/12
- 2 turbine(s) GE
- Hub height: 80 m
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developed by: WKN AG
- Operator: WKN AG
- Owner: Difko A/S
Part #2:
- Commissioning: 2005
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 1,700 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2006
- 7 turbine(s) (manufacturer name not available)
- Total nominal power: 5,950 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2009
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012
Complete/correct this sheet: contact page