Lemvig windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Lemvig
- Country: Denmark
- Total power: 18 MW
- Estimated annual production: 45 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2003/01
- 4 turbine(s) Bonus B82/2300 (power 2300 kW, diameter 82 m)
- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2003/01
- 2 turbine(s) Vestas V80/2000 (power 2000 kW, diameter 80 m)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2002/12
- 2 turbine(s) Vestas V80/2000 (power 2000 kW, diameter 80 m)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Part #4:
- City: Vestjysk
- Commissioning: 1978
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 900 kW
- Operational
- Onshore wind farm
- Developed by: Tvindkraft
- Operator: Tvindkraft
- Owner: Tvindkraft
Update for this sheet: 03/2011
Complete/correct this sheet: contact page