Generalities
- Wind farm name: Hassing
- Country: Denmark
- Total power: 10 MW
- Estimated annual production: 26 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002/12
- 3 turbine(s) Vestas V66/1750 (power 1750 kW, diameter 66 m)
- Total nominal power: 5,250 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1996/06
- 1 turbine(s) Neg Micon M1500-600 (power 600 kW, diameter 43 m)
- Hub height: 46 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1996/07
- 1 turbine(s) Neg Micon M1500-600 (power 600 kW, diameter 43 m)
- Hub height: 46 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1997/10
- 3 turbine(s) Neg Micon M1800-600/48 (power 600 kW, diameter 48 m)
- Hub height: 46 m
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1997/12
- 2 turbine(s) Neg Micon M1800-600/48 (power 600 kW, diameter 48 m)
- Hub height: 46 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1997/10
- 1 turbine(s) Neg Micon M1800-600/48 (power 600 kW, diameter 48 m)
- Hub height: 46 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1988/06
- 1 turbine(s) Vestas V25/200 (power 200 kW, diameter 25 m)
- Hub height: 30 m
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Part #8:
- Commissioning: 1990/09
- 1 turbine(s) Bonus B23/150 (power 150 kW, diameter 23 m)
- Hub height: 30 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm