Frederikshavn windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Frederikshavn
- Country: Denmark
- County / Zone: Northern Denmark
- Total power: 23 MW
- Estimated annual production: 56 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Frederikshavn
- Commissioning: 2003
- 1 turbine(s) Vestas V90/3000 (power 3000 kW, diameter 90 m)
- Total nominal power: 3,000 kW
- Operational
- Offshore wind farm
- Operator: Dong Energy
Part #2:
- City: Frederikshavn
- Commissioning: 1986/12
- 1 turbine(s) Vindsyssel VS150/22 (power 150 kW, diameter 22 m)
- Hub height: 26 m
- Total nominal power: 130 kW
- Operational
- Onshore wind farm
- Operator: Dong Energy
Part #3:
- City: Frederikshavn
- Commissioning: 2003
- 1 turbine(s) Nordex N90/2300 (power 2300 kW, diameter 90 m)
- Total nominal power: 2,300 kW
- Operational
- Offshore wind farm
- Operator: Dong Energy
Part #4:
- City: Frederikshavn
- Commissioning: 2003
- 1 turbine(s) Vestas V90/3000 (power 3000 kW, diameter 90 m)
- Total nominal power: 3,000 kW
- Operational
- Offshore wind farm
- Operator: Dong Energy
Part #5:
- City: Frederikshavn
- Commissioning: 2003
- 1 turbine(s) Bonus B82/2300 (power 2300 kW, diameter 82 m)
- Total nominal power: 2,300 kW
- Operational
- Offshore wind farm
- Operator: Dong Energy
Part #6:
- City: Frederikshavn
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 12,000 kW
- Under construction
- Offshore wind farm
- Developed by: Dong Energy
Update for this sheet: 04/2012
Complete/correct this sheet: contact page