Tryggelev windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Tryggelev
- Country: Denmark
- Total power: 4 MW
- Estimated annual production: 9 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000/09
- 1 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 50 m
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2002/12
- 1 turbine(s) Neg Micon NM64c/1500 (power 1500 kW, diameter 64 m)
- Hub height: 48 m
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2002/08
- 1 turbine(s) Neg Micon NM52/900 (power 900 kW, diameter 52 m)
- Hub height: 49 m
- Total nominal power: 900 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2000/10
- 1 turbine(s) Nordex N50/800 (power 800 kW, diameter 50 m)
- Hub height: 50 m
- Total nominal power: 800 kW
- Operational
- Onshore wind farm