Havbro windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Havbro
- Country: Denmark
- Total power: 2 MW
- Estimated annual production: 3 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1997/10
- 1 turbine(s) Neg Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height: 50 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1997/10
- 1 turbine(s) Neg Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height: 50 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm