Stangerum windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Stangerum
- Country: Denmark
- Total power: 4 MW
- Estimated annual production: 9 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1998/05
- 3 turbine(s) Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height: 46 m
- Total nominal power: 2,250 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1999/02
- 1 turbine(s) Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height: 46 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1998/05
- 1 turbine(s) Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height: 46 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm